İn a 40-cycle worker-machine time study, the operator time is 0.60 minutes for each cycle and the machine time is 1.40 minutes for each cycle. The employee performance rating is 115%, and additional times for an 8-hour shift are personal need time, 30 minutes, fatigue time is 20 minutes, delay time is 30 minutes. Calculate the standard time for combined labor machine operation.