Task: Calculate the net cycle time and the gross cycle time

Grinding production process:

– There are three identical, fully automated grinding machines, each of which must be continuously
by one employee at a time
– Each grinding machine has a processing time of 24 seconds per spring
– Before the process there is wire for springs, which lasts for 15 days
– After the process there are 15,000 coiled springs in wire mesh boxes
– Short downtimes and slow running during grinding: 20 minutes per shift for the entire
production process
– Maintenance during grinding: 15 minutes per shift for the entire production process
– Faults during grinding: 15 minutes per shift for the entire production process
– Grinding set-up time: 20 minutes per shift for the entire production process.
– The quality loss factor during grinding is 10%, i.e. 90% of the springs do not show any defects after
no defects after grinding
– After the grinding production process, the springs are directly fed into the tempering production process.
Tempering